Washington Bridge Closure Crisis

RIDOT shuts down Washington Bridge westbound from East Providence, East Bay

Repair could take months if significant; damage to original span found during reconstruction

Posted 12/11/23

PROVIDENCE — The Rhode Island Department of Transportation announced late Monday afternoon, Dec. 11, the closure of the westbound side of the Washington Bridge due to the finding of a critical …

This item is available in full to subscribers.

Please log in to continue

Log in

Register to post events


If you'd like to post an event to our calendar, you can create a free account by clicking here.

Note that free accounts do not have access to our subscriber-only content.

Day pass subscribers

Are you a day pass subscriber who needs to log in? Click here to continue.


Washington Bridge Closure Crisis

RIDOT shuts down Washington Bridge westbound from East Providence, East Bay

Repair could take months if significant; damage to original span found during reconstruction

Posted

PROVIDENCE — The Rhode Island Department of Transportation announced late Monday afternoon, Dec. 11, the closure of the westbound side of the Washington Bridge due to the finding of a critical failure of some bridge components.

These particular components are part of the original span which was built in 1968. They were uncovered during the ongoing reconstruction of the bridge.

Initially, all the westbound lanes will be closed and traffic diverted to alternate routes. In the next two to three weeks RIDOT will move traffic to two lanes on the eastbound side at which time permanent repairs will begin on the westbound side. This will require a closure of two lanes on I-195 East in the area of Exit 1A (India Street) starting at 9 a.m., Tuesday, Dec. 12.

Depending on the severity of what RIDOT finds in its initial work, the repair could take three months or more. RIDOT has alerted emergency vehicle operators and officials in the adjoining cities and towns.

RIDOT Director Peter Alviti said, “In the process of reconstructing the Washington Bridge, our consultants found urgent safety issues that could cause a critical deficiency on this side of the bridge. We are closing the westbound side until we can make it completely safe.”

Beginning immediately and during the time that it takes to make the repairs and reopen the westbound side, travelers are asked to take the following marked detour routes:

  • Local traffic in East Providence: Take Exit 2 to Broadway. Follow detour signs to the Henderson Bridge and rejoin I-195 West at Gano Street.
  • Southeast Massachusetts west of Fall River: Take Massachusetts Exit 1 and follow Route 114A. Follow onto Route 114 (Pawtucket Avenue) or Route 1A (Newport Avenue) to I-95. This is the preferred routes for trucks.
  • Southeast Massachusetts east of Fall River (including traffic coming from Cape Cod and the New Bedford Area): Take Massachusetts Exit 14B to Route 24 North. Follow to I-495 North to I-95.
Washington Bridge, Closure, East Providence, Rhode Island

2024 by East Bay Media Group

Barrington · Bristol · East Providence · Little Compton · Portsmouth · Tiverton · Warren · Westport
Meet our staff
MIKE REGO

Mike Rego has worked at East Bay Newspapers since 2001, helping the company launch The Westport Shorelines. He soon after became a Sports Editor, spending the next 10-plus years in that role before taking over as editor of The East Providence Post in February of 2012. To contact Mike about The Post or to submit information, suggest story ideas or photo opportunities, etc. in East Providence, email mrego@eastbaymediagroup.com.